According to the Massachusetts Coastal Zone Management, most of the city’s shoreline will be subjected to flooding by 2030. Pier 58 Gloucester was intentionally designed on pilings in order to handle sea level rise. The added benefit of this design would be easy access for lobstermen to their trucks and fishing equipment through a beneath-the-building garage.